CROSS-STANDARD public interest · EV charger

China-to-Greece EV Charger Compliance Gap Matrix

AI-compiled from official public sources — cross-checked by multiple AI models, not human-verified. Informational only; see disclaimer. Public-interest, source-linked comparison of common China EV charger documentation against Greece (ELOT/RAAEY/IPTO/HEDNO) and EU CE framework expectations, including IEC 61851, IEC 62196-2 Type 2/CCS2 compatibility, electrical protection-device requirements, AFIR public-charging obligations, and national installation rules.

Dataset 2026-06-11 Last verified 2026-06-15 12 rows

Compliance Gap Matrix

Gap matrix
Compliance item Common China baseline Greece (ELOT / RAAEY / IPTO) Gap / action Source + verification date
AC Charging Connector Standard (Type 2) China uses GB/T 20234.2 for AC charging, which defines a physically distinct 7-pin connector incompatible with IEC Type 2. GB/T plugs cannot mate with EU Type 2 sockets.GB/T 20234.2-2015 (AC EV charging connector, China) EU public AC recharging points, including in Greece, are subject to AFIR (Regulation (EU) 2023/1804) requirements for connector availability. AFIR Annex II specifies Type 2 for normal-power AC recharging points. IEC/EN 62196-2 describes the Type 2 technical connector design; the legal obligation is AFIR, while the IEC/EN standard is the technical specification route.IEC 62196-2 (Type 2 AC connector)
EN 62196-2
Regulation (EU) 2023/1804 (AFIR), Art. 4
Directive 2014/94/EU (AFID) [superseded by AFIR]
Hardware connector is physically incompatible. A Chinese EV or EVSE designed only around a GB/T AC interface cannot interoperate with EU public Type 2 AC infrastructure (including Greek public charging) without a physical inlet/socket and control-interface redesign. The connector body, pin count, and locking mechanism all differ. Any adapter strategy for public infrastructure must be checked against AFIR and Greek/EU safety rules rather than treated as a substitute for compliant connector design.[INFORMATIONAL] Non-compliant for EU public charging interoperability as-is if the product only supports GB/T AC. EU/Greek public AC infrastructure must meet AFIR connector requirements, and IEC/EN 62196-2 Type 2 is the technical specification used for that route. GB/T AC interfaces are not a substitute for AFIR-compliant Type 2 compatibility. Hellenic Organization for Standardization (ELOT / NQIS)2026-06-15 · verified
DC Fast-Charging Connector Standard (CCS Combo 2) China uses GB/T 20234.3 for DC fast charging, defining a physically distinct 9-pin connector (CHAdeMO-influenced design) incompatible with CCS Combo 2. The pin layout, communication protocol (CAN vs. PLC), and inlet shape all differ.GB/T 20234.3-2023 (DC EV charging connector, China) EU public DC recharging points, including in Greece, are subject to AFIR (Regulation (EU) 2023/1804) requirements for connector availability. AFIR Annex II specifies Combo 2 for high-power DC recharging points. IEC/EN 62196-3 describes the CCS Combo 2 technical connector design; the legal obligation is AFIR, while the IEC/EN standard is the technical specification route.IEC 62196-3 (CCS Combo 2 DC connector)
EN 62196-3
Regulation (EU) 2023/1804 (AFIR), Art. 4 & Annex II
Directive 2014/94/EU (AFID) [superseded]
Hardware connector is physically incompatible. Chinese EVs or EVSE with only a GB/T DC interface cannot fast-charge at EU/Greek CCS2 public stations without hardware and communication-stack redesign. The vehicle/charger communication stack (GB/T 27930 CAN vs. ISO 15118 / DIN 70121 PLC pathways in common EU CCS practice) also differs, compounding the incompatibility beyond the physical plug. Any adapter strategy for public infrastructure must be checked against AFIR and Greek/EU safety rules.[INFORMATIONAL] Non-compliant for EU public DC charging interoperability as-is if the product only supports GB/T DC. EU/Greek public DC infrastructure must meet AFIR connector requirements, and IEC/EN 62196-3 CCS Combo 2 is the technical specification used for that route. GB/T DC interfaces are not a substitute for AFIR-compliant Combo 2 compatibility. Hellenic Organization for Standardization (ELOT / NQIS)2026-06-15 · verified
Legal Mandate: AFIR vs. AFID and Transition Timeline China's equivalent policy mandate is GB/T 20234 series (enforced via MIIT type-approval). No bilateral connector recognition or mutual acceptance agreement exists between China GB/T and EU IEC 62196 standards. (Confirmed: no bilateral connector or certification mutual recognition treaty between CN GB/T 20234 and EU IEC 62196 has been concluded as of June 2026.)GB/T 20234.1-2023 (general requirements)
GB/T 20234.2-2015 (AC)
GB/T 20234.3-2023 (DC)
MIIT EV type-approval requirements (China)
Regulation (EU) 2023/1804 (AFIR) replaced Directive 2014/94/EU (AFID) with binding targets. AFIR entered into force 13 April 2024. New public charging pools must comply from that date; all existing pools must be upgraded to Type 2 / CCS2 by 2025–2026 depending on power level. AFIR is directly applicable in all EU member states, including Greece, without transposition.Regulation (EU) 2023/1804 (AFIR) — OJ L 2023/1804, 22 Sep 2023
Directive 2014/94/EU (AFID) [superseded]
No harmonisation or mutual recognition between GB/T and IEC 62196 series. AFIR is a binding EU Regulation (not a Directive), meaning no member-state flexibility — including in Greece — to accept GB/T connectors. Any EV destined for the Greek/EU market must carry Type 2 (AC) and CCS Combo 2 (DC) inlets as a hard market-entry requirement.[INFORMATIONAL] Non-compliant as-is for EU/Greek public charging infrastructure where a product relies on Chinese GB/T connectors only. AFIR creates the binding EU obligation for in-scope public infrastructure; Type 2 / Combo 2 technical compatibility is the practical redesign item. This is a product and infrastructure interoperability gap, not merely a documentation gap. Hellenic Organization for Standardization (ELOT / NQIS)2026-06-15 · reference
IPTO/HEDNO Grid Connection — 230/400 V 50 Hz Network China domestic charger installations are commonly documented under GB/T 18487.1-2023, GB/T 20234 connector standards, GB/T 27930-2023 for DC communication, and local grid-operator acceptance. China domestic supply is 220 V single-phase / 380 V three-phase at 50 Hz. The shared 50 Hz frequency does not mean voltage equivalence: Greece 230/400 V requires input-voltage, protection-threshold, thermal, and metering validation beyond the China baseline.GB/T 18487.1-2023
GB/T 20234.2-2015
GB/T 20234.3-2023
GB/T 27930-2023
China local grid operator project-acceptance requirements
Greek electricity supply is operated through the transmission system operator IPTO/ADMIE and the distribution operator HEDNO/DEDDIE, with energy-sector oversight by RAAEY (Regulatory Authority for Waste, Energy & Water). The low-voltage context is 230 V single-phase / 400 V three-phase at 50 Hz. That is the same frequency as China but a different nominal voltage from China's 220/380 V baseline. Grid-connected charger projects should be treated as site-specific electrical installations requiring HEDNO supply-capacity review, protection coordination, metering, earthing, harmonic and power-quality review, commissioning, and written project acceptance before energisation.IPTO/ADMIE transmission network connection and project acceptance (Greece)
HEDNO/DEDDIE distribution network connection and project acceptance (Greece)
RAAEY electricity-sector oversight
IEC 61000 series — electromagnetic compatibility and power quality
IEC 61851-1 — EV conductive charging system general requirements
Exporters must confirm that the charger covers 230 V single-phase / 400 V three-phase at 50 Hz, not only China's 220/380 V settings. Protection thresholds, leakage-current devices, metering accuracy, harmonic emissions, supply-capacity calculations, earthing, surge protection, and commissioning documents should be prepared for HEDNO review under RAAEY oversight. For non-interconnected island grids and resort or solar-linked sites, load management and demand limits should be agreed with HEDNO before shipment.[INFORMATIONAL] Greece-ready EVSE needs IPTO/HEDNO project acceptance under RAAEY oversight and explicit 230/400 V 50 Hz validation. Do not describe the voltage as matching China: only the 50 Hz frequency matches, while nominal voltage differs from China's 220/380 V baseline. Hellenic Electricity Distribution Network Operator (HEDNO / DEDDIE)2026-06-15 · reference
CE Conformity Assessment — LVD, EMC, RED (if wireless) In China, EV chargers require China Compulsory Certification (CCC) under the GB/T and GB standards regime. Key standards include GB/T 18487.1 (AC charging system) and GB/T 20234 series (connectors). CCC is a mandatory third-party certification through designated bodies (CABs); it does not involve self-declaration and is structurally different from CE's conformity-based model.GB/T 18487.1-2015 (AC EV charging system)
GB/T 20234.1-2023 (general requirements for connectors)
GB/T 20234.2-2015 (AC charging interface)
GB/T 20234.3-2023 (DC charging interface)
CCC certification (CNCA mandatory)
EV chargers sold in the EU, including Greece, must bear the CE marking, demonstrating conformity with all applicable EU legislation. Wired AC/DC chargers typically fall under LVD (2014/35/EU) and EMC Directive (2014/30/EU); chargers with wireless communication (e.g., Wi-Fi, Bluetooth for smart charging) additionally require conformity with RED (2014/53/EU). Conformity is generally established by manufacturer self-declaration supported by a technical file. Harmonised EN standards are voluntary routes to presumption of conformity, not mandatory legal requirements in themselves.Directive 2014/35/EU (LVD)
Directive 2014/30/EU (EMCD)
Directive 2014/53/EU (RED)
EN 61851-1 (AC EV charging)
EN IEC 61851-21-2 (EMC for off-board EV chargers)
EN 55032 / EN 55035 (EMC emissions/immunity)
Chinese manufacturers must obtain CE marking via EU-recognised conformity assessment routes (self-declaration under harmonised EN standards or notified-body involvement for certain RED equipment). CCC certification is not recognised in the EU and does not substitute for CE. Manufacturers must generate EU-specific technical documentation, test reports referencing EN standards, and an EU Declaration of Conformity — none of which are produced as part of the CCC process.[INFORMATIONAL] CE marking is mandatory before placing EV chargers on the Greek/EU market. CCC does not substitute for CE. Manufacturers must independently build EU technical files and, for wireless-enabled chargers, ensure RED compliance where applicable. Harmonised EN standards may support presumption of conformity but are not the mandatory legal obligation themselves. Regulatory Authority for Waste, Energy & Water (RAAEY)2026-06-15 · verified
EU Declaration of Conformity (DoC) and Technical File Under the Chinese CCC regime, the equivalent documentary output is the CCC certificate issued by the designated certification body, accompanied by type-test reports. There is no manufacturer self-declaration equivalent to the EU DoC; the certificate is issued by a third party. Post-certificate, manufacturers must maintain a production consistency system audited periodically by the CAB.CNCA-C25-01:2024 (CCC implementation rules for EV charging equipment — effective 1 March 2025, supersedes any prior voluntary-only scheme; issued CNCA Announcement No. 25/2024)
Measures for the Administration of Compulsory Product Certification (SAMR 2020)
Before placing a product on the EU market, including in Greece, the manufacturer (or its EU authorised representative) must draw up an EU Declaration of Conformity (DoC) listing all applicable directives and the harmonised standards applied, and must compile and retain a technical file for at least 10 years. The DoC must be made available to market surveillance authorities on request. Requirements are set out in each applicable directive (LVD Art. 15, EMCD Art. 14, RED Art. 19) and in Decision 768/2008/EC (modular conformity assessment).Directive 2014/35/EU Art. 15 (LVD DoC)
Directive 2014/30/EU Art. 14 (EMCD DoC)
Directive 2014/53/EU Art. 19 (RED DoC)
Decision 768/2008/EC (modular conformity assessment framework)
Chinese manufacturers exporting to the EU must create an EU-format DoC from scratch — listing each applicable EU directive, the specific harmonised standards applied, the manufacturer's name and address (or EU authorised representative's), and a traceable signatory. The CCC certificate neither replaces nor simplifies this; test data generated for CCC may be re-used only if it was produced against equivalent EN test methods, which requires engineering review.[INFORMATIONAL] An EU DoC is a legal document that manufacturers or their EU representatives must sign and retain. It cannot be delegated to a test lab or certification body. Chinese exporters with only CCC documentation must draft the DoC in-house or engage an EU-based compliance consultant. Regulatory Authority for Waste, Energy & Water (RAAEY)2026-06-15 · verified
EU Economic Operator / Authorised Representative — Regulation (EU) 2019/1020 China has no direct regulatory equivalent requiring a domestic responsible operator for export-bound products. Chinese manufacturers exporting abroad appoint foreign distributors or agents commercially, but there is no statutory requirement to designate an EU-resident legal representative responsible for CE compliance and market surveillance cooperation.N/A — no direct Chinese equivalent Regulation (EU) 2019/1020 on market surveillance and product compliance requires that products placed on the EU market have an identifiable 'responsible economic operator' established in the EU. For products manufactured outside the EU, this means the importer or, if no EU importer, a mandated EU authorised representative (Art. 4). The responsible operator must: hold the DoC and technical file or ensure they are accessible; register in RAPEX/ICSMS where required; cooperate with market surveillance authorities; and take corrective action if a product is non-compliant. This obligation applies to EV chargers as CE-marked electrical equipment, and is enforced in Greece by the national market surveillance authorities.Regulation (EU) 2019/1020, Art. 4 (responsible economic operator)
Regulation (EU) 2019/1020, Art. 5 (obligations of importers)
Regulation (EU) 2019/1020, Art. 8 (market surveillance obligations)
This is a structural gap with no Chinese regulatory analogue. A Chinese EV charger manufacturer shipping directly to Greek/EU customers (e.g., via e-commerce) must appoint an EU-established authorised representative before the first unit enters the EU market. Without one, the product cannot legally be placed on the EU market under Regulation 2019/1020. The AR must be named on the product label or documentation.[INFORMATIONAL] Chinese manufacturers without an EU importer must appoint an EU-established authorised representative. This is a hard legal gate under Regulation 2019/1020 — no EU AR means the product cannot lawfully enter the Greek/EU market, regardless of CE marking status. Regulatory Authority for Waste, Energy & Water (RAAEY)2026-06-15 · verified
AFIR — Public EV Charging: Ad-hoc Payment, Interoperability and Technical Specifications China has no direct regulatory equivalent to AFIR's functional public-charging requirements. The closest standards are GB/T 34658 (interoperability requirements) and NB/T 33025 (communication protocols for EV charging), plus GB/T 27930 (DC charging communication). Chinese public chargers are increasingly connected via operator platforms (e.g., State Grid, Southern Grid, TELD), but AFIR-equivalent ad-hoc payment, data-access, smart recharging and EU connector requirements are not mandated by Chinese regulation.GB/T 34658-2017 (EV conductive charging interoperability requirements)
NB/T 33025-2016 (EV DC charging communication protocol — EVSE side)
GB/T 27930-2015 (communication protocol between off-board charger and BMS)
Regulation (EU) 2023/1804 (AFIR) mandates functional requirements for publicly accessible EV recharging points, directly applicable in Greece. AFIR-confirmed requirements include: (1) ad-hoc charging without a subscription or contract, with the payment instruments required by AFIR for relevant publicly accessible recharging points; (2) transparent price information before a charging session starts; (3) digital connectivity, smart recharging capability, static data and dynamic data obligations for publicly accessible infrastructure; (4) AFIR Annex II technical specifications for publicly accessible recharging points, including Type 2 for normal-power AC recharging points and Combo 2 for high-power DC recharging points; and (5) TEN-T deployment targets for recharging pools. AFIR replaces Directive 2014/94/EU (AFID).Regulation (EU) 2023/1804 (AFIR) — full text
AFIR Annex II (technical specifications for publicly accessible recharging points)
Significant functional gap for public charging deployments in Greece: (1) ad-hoc payment functionality may need to be added for EU public deployments; (2) digital connectivity, smart recharging, data-access and roaming/data exchange obligations may differ from proprietary Chinese operator platforms; (3) AFIR Annex II connector specifications differ from Chinese GB/T connector practice. These AFIR requirements apply primarily to charge point operators (CPOs), but hardware and software capability must be available at installation.[INFORMATIONAL] AFIR introduces functional requirements for publicly accessible charging points in Greece, including ad-hoc payment, price transparency, digital connectivity, smart recharging, data obligations and Annex II connector specifications. Chinese charger hardware intended for Greek/EU public deployment must be verified for AFIR compliance before installation. Regulatory Authority for Waste, Energy & Water (RAAEY)2026-06-15 · reference
OCPP, EMC, Radio Modules, and Power Quality China DC fast chargers commonly use GB/T 27930-2023 CAN communication between the off-board charger and vehicle BMS. This is not OCPP back-office communication and is not the CCS2 communication direction. China-market chargers may also include China-specific payment, SIM, cloud, and operator integrations that need reconfiguration for Greek operators, roaming, language, currency, and data interfaces.GB/T 27930-2023
GB/T 18487.1-2023
China operator-specific back-office protocols
China radio module approvals where applicable
Networked EV chargers in Greece should be specified for OCPP back-office interoperability where a charge-point operator, fleet operator, public-sector project, or RAAEY-linked programme requires remote monitoring, billing, diagnostics, or load management. Electrical and electronic emissions and immunity evidence should align with IEC 61000 EMC and power-quality standards, and EMC Directive 2014/30/EU conformity is required for CE marking. Cellular, Wi-Fi, RFID, payment, or smart-metering modules may trigger additional communications, spectrum, cybersecurity, RED, and data-interface checks under Greek or EU requirements. Greek-language documentation is often expected for end-user and installation materials.OCPP — Open Charge Point Protocol for networked EV chargers
Directive 2014/30/EU (EMC Directive) — mandatory for CE marking
Directive 2014/53/EU (RED) — where radio modules are in scope
IEC 61000 series — electromagnetic compatibility and power quality
IEC 61851-24 — digital communication between DC EV charging station and EV
EETT (Hellenic Telecommunications and Post Commission) or applicable spectrum authority requirements for radio modules where in scope
Exporters must confirm the OCPP version, charge-point-management-system integration, remote diagnostics, load management, payment or RFID flow, SIM or communications module approval path (including RED conformity for radio modules), and IEC 61000 EMC / EMC Directive reports for the final Greek configuration. For DC CCS2 products, GB/T 27930 must not be presented as the relevant communication evidence. Harmonic current and immunity data should be reviewed against the specific HEDNO supply point and grid constraints.[INFORMATIONAL] Greek networked chargers should be validated for OCPP integration, IEC 61000 EMC / EMC Directive conformity and power quality, RED conformity for radio modules, and local communications-module requirements (e.g., EETT). GB/T 27930 alone does not satisfy OCPP, CCS2 communication, or back-office interoperability needs. Hellenic Organization for Standardization (ELOT / NQIS)2026-06-15 · reference
Low Voltage Safety — EV Charging Equipment (General) China commonly references GB/T 18487.1-2015 (Electric vehicle conductive charging system — General requirements), which is technically aligned with IEC 61851-1 but incorporates national deviations. It is enforced under the GB framework administered by SAMR/SAC. GB/T 18487.1 testing and certification by a Chinese CNAS-accredited lab is NOT recognised as equivalent to EN IEC 61851-1 testing under the EU LVD conformity assessment pathway.GB/T 18487.1-2015 — Electric vehicle conductive charging system — General requirements (SAMR/SAC) EV charging equipment placed on the EU market, including Greece, must comply with the Low Voltage Directive 2014/35/EU, ensuring it is designed and manufactured to be safe when correctly installed and maintained. Equipment must meet the Essential Safety Requirements (Annex I) covering protection against electric shock, insulation, overcurrent/overtemperature protection, and clearances. Harmonised standard EN IEC 61851-1:2019 (Mode 1–4 conductive charging, AC and DC, general requirements) provides a presumption of conformity.Directive 2014/35/EU (Low Voltage Directive)
EN IEC 61851-1:2019 — Electric vehicle conductive charging system — Part 1: General requirements
Exporters should build an EU conformity file against the LVD essential safety requirements and may use EN IEC 61851-1:2019 testing as evidence for presumption of conformity. Existing Chinese GB/T 18487.1 test reports do not automatically substitute because scope, deviations, connector assumptions and documentation differ. A Notified Body is not mandatory for LVD; manufacturer self-declaration with a Technical File is the normal route. Documentation gap: EU Declaration of Conformity, CE marking, and EU-language technical instructions (including Greek where required) are all required.[INFORMATIONAL] CE marking under LVD 2014/35/EU is mandatory. EN IEC 61851-1:2019 is a voluntary harmonised standard that can grant presumption of conformity for general EV conductive charging; it is not the legal obligation itself. Chinese GB/T 18487.1 certification does not by itself satisfy the EU conformity assessment pathway; EU evidence against the LVD requirements is needed. Hellenic Organization for Standardization (ELOT / NQIS)2026-06-15 · verified
DC Charging Station Safety — EV Conductive Charging China's DC charging station domestic equivalent is GB/T 18487.3-2001 (AC/DC electric vehicle charging station — the only published Part 3 of the 18487 series; note: a GB/T 18487.3-2015 does not exist). The current DC system standard is GB/T 18487.5-2024 (DC charging system for GB/T 20234.3 connector). The DC coupler standard is GB/T 20234.3-2023, which supports up to 1500 V / 800 A. CQC or CNAS certification to these Chinese standards is not accepted under the EU LVD CE marking pathway.GB/T 18487.3-2001 — Electric vehicle conductive charging system — AC/DC electric vehicle charging station (only published edition; no 2015 revision exists)
GB/T 18487.5-2024 — Electric vehicle conductive charging system — Part 5: DC charging system for GB/T 20234.3 (current DC system standard)
GB/T 20234.3-2023 — Connection set for conductive charging of electric vehicles — Part 3: DC charging coupler (supersedes 2015 edition)
DC charging stations (Mode 4, off-board chargers) placed on the EU market, including Greece, must comply with the Low Voltage Directive 2014/35/EU where within scope. EN IEC 61851-23:2023 (Electric vehicle conductive charging system — Part 23: DC EV charging station) is a current product standard that may be used as technical evidence and, where cited as harmonised, gives presumption of conformity; it is not itself the mandatory legal obligation. Key technical topics include isolation monitoring, interlock systems, control pilot functions, maximum voltage/current ratings, and communication protocols for DC supply.EN IEC 61851-23:2023 — Electric vehicle conductive charging system — Part 23: DC EV charging station (current edition, supersedes 2014)
Directive 2014/35/EU (Low Voltage Directive)
DC charging stations exported to Greece/EU should be assessed against the LVD essential safety requirements and may use EN IEC 61851-23:2023 testing as presumption-of-conformity evidence where applicable. Particular attention is needed for: (1) CCS2 (Combined Charging System Type 2) connector compliance vs. Chinese GB/T connector; (2) isolation monitoring requirements per European grid topology; and (3) CHAdeMO or CCS2 communication protocol compatibility. The connector type itself is a hardware gap — Chinese DC stations typically use GB/T 20234.3 plugs, which are not CCS2 or CHAdeMO compatible without hardware redesign.[INFORMATIONAL] DC charging stations require CE marking under the applicable EU legislation, including LVD where in scope. EN IEC 61851-23:2023 is a voluntary product standard used as technical evidence or presumption-of-conformity support where harmonised; it is not mandatory in itself. Chinese GB/T 18487.3 certification is not accepted as an EU conformity assessment substitute. A significant hardware gap exists where Chinese DC stations use GB/T connectors incompatible with EU CCS2 practice. Hellenic Organization for Standardization (ELOT / NQIS)2026-06-15 · reference
Electrical Installation Safety — EV Charging in Buildings (IEC 60364-7-722) China addresses EV charging installation primarily through GB 50966-2014 (Code for design of electric vehicle charging station) and GB/T 51313-2018 (Technical standard for electric vehicle charging infrastructure), administered by the Ministry of Housing and Urban-Rural Development (MOHURD). These cover site design and installation but differ from IEC 60364-7-722 in RCD type requirements, earthing system assumptions (TN-S vs. Chinese practice), and load management protocols. Chinese installation documentation is not accepted as evidence of compliance with Greek/EU member-state installation standards.GB 50966-2014 — Code for design of electric vehicle charging station (MOHURD)
GB/T 51313-2018 — Technical standard for electric vehicle charging infrastructure (MOHURD/MIIT)
EU member-state electrical installation law and grid/installer rules govern the building-side circuits supplying EV charging points. In Greece these apply alongside the national electrical installation rules (ELOT HD 384 / ELOT 60364 framework). IEC 60364-7-722 / HD 60364-7-722 provide the commonly adopted technical installation route covering protective measures (RCD type B or A+DC detection), wiring, earthing, and load management. These standards apply to the building-side installation infrastructure, not the charger product itself, but exported EV chargers should be compatible with these installation requirements so they can be accepted by Greek installers and HEDNO.IEC 60364-7-722:2018 — Low-voltage electrical installations — Part 7-722: Requirements for special installations or locations — Supply of electric vehicles
HD 60364-7-722 (CENELEC harmonised document, adopted by EU member states including Greece via ELOT)
ELOT HD 384 / ELOT 60364 — Greek national electrical installation rules framework
IEC 60364-7-722 / HD 60364-7-722 are installation standards — they govern fixed wiring and protection devices at the building side, not the charger product itself. However, exported EV chargers should declare compatibility with Type B RCDs or incorporate internal DC fault protection to allow Type A RCDs under Greek/EU installation practice. A charger that requires installation conditions not achievable under the Greek ELOT HD 384 framework will fail field acceptance. Chinese charger datasheets often omit compatibility statements expected by Greek installers and HEDNO.[INFORMATIONAL] IEC 60364-7-722 / HD 60364-7-722 govern building-side installation practice as adopted in Greece through the ELOT HD 384 framework. EV chargers exported to Greece should be compatible with the RCD and earthing requirements expected by installers and HEDNO. This is distinct from product-level CE marking under LVD, but non-compatibility can block field installation. Chinese installation standards (GB 50966 / GB/T 51313) are not substitutes. Hellenic Organization for Standardization (ELOT / NQIS)2026-06-15 · reference

Named editorial review

Pending named reviewer

Official regulator, standards body, notified body, customs, or primary legal source preferred. Local PDFs are not accepted.

Editorial controls

Rows must include publisher, official URL, access date, verification flag, and last_verified before human_reviewed can be true.

Official-source register.