PROOF LAB 02 · DIGITAL GRID & SOLID-STATE RACK POWER VERIFICATION
Verify cross-market technical conformity before a single unit ships. Test IEC 61850-3 / IEEE 1613 substation protection gateways for <4 ms GOOSE latency and 4 kV surge immunity, solve OCP ORv3 80 PLUS Titanium PSU & 3-Phase Smart PDU safety mapping across UL 62368-1 / CE-LVD, and execute 100% Non-DG air-freight screening with strict UN3480 hazard isolation.
Clause-level verification from GB/DL national standards to IEC, IEEE, UL & EN — inspect live API & MCP tools →
INTERACTIVE BENCH 01 · DIGITAL SUBSTATION PROTECTION & TELECONTROL
Select a substation bay architecture, EMC surge zone, and PRP/HSR ring hop count to verify deterministic GOOSE trip transfer times and GB/DL-to-IEC/IEEE clause equivalence.
| Immunity Test / Phenomenon | International Standard (IEC / IEEE) | China Source Standard (GB / DL/T) | Active Test Level & Criterion | Hardware Design Verification |
|---|---|---|---|---|
| Surge Immunity (Line-to-Earth / Line-to-Line) | IEC 61850-3 / IEC 61000-4-5 Level 4 | DL/T 860.3 / GB/T 17626.5 Level 4 | ±4 kV L-E / ±2 kV L-L (Criterion A — Zero Reset) | TVS + Gas Discharge Tube + 3.0 kVrms Galvanic Isolation |
| Electrical Fast Transient / Burst (EFT/B) | IEC 61850-3 / IEC 61000-4-4 Level 4 & IEEE 1613 | GB/T 17626.4 Level 4 (5 kHz / 100 kHz) | ±4 kV Power & I/O Ports (Criterion A — Zero Packet Drop) | Common-Mode Choke + Shielded RJ45 / LC Fiber Transceivers |
| Damped Oscillatory Wave (100 kHz & 1 MHz) | IEC 61000-4-18 Level 3 / IEEE C37.90.1 SWC | GB/T 17626.18 / GB/T 14598.26 | ±2.5 kV CM / ±1.25 kV DM (IEEE 1613 Class 2) | Zero GOOSE Frame Corruption under Continuous SWC Injection |
| Electrostatic Discharge (ESD) & Radiated RF | IEC 61000-4-2 (±8 kV Contact / ±15 kV Air) & 4-3 (20 V/m) | GB/T 17626.2 Level 4 & GB/T 17626.3 | ±8 kV Contact / ±15 kV Air / 20 V/m (80 MHz–6 GHz) | 6-Sided Chassis Faraday Seam + Conductive Gasket Grounding |
INTERACTIVE BENCH 02 · DATA-CENTER SOLID-STATE RACK POWER
Configure rack power hardware and target destination jurisdiction to generate the cross-market safety, efficiency, and EMC conformity matrix bridging GB 4943.1 / GB/T 9254.1 to UL 62368-1 and CE-LVD.
INTERACTIVE BENCH 03 · AIR-CARGO LOGISTICS & DG FIREWALL
Audit bill-of-materials energy storage components prior to dispatch. Asaptic isolates UN3480 lithium-ion battery trays from solid-state ORv3 PSUs, 3-Phase PDUs, and IEC 61850 gateways so critical rack and grid hardware clears air cargo in 24–48 hours.
END-TO-END EXECUTION ARCHITECTURE
From utility tender parsing to factory type-test verification and split-lane Non-DG air fulfillment.