CROSS-STANDARD public interest · EV charger

China-to-North Macedonia EV Charger Compliance Gap Matrix

AI-compiled from official public sources — cross-checked by multiple AI models, not human-verified. Informational only; see disclaimer. Public-interest, source-linked comparison of common China EV charger documentation against North Macedonia CE-style expectations, ISRSM / TS EN IEC 61851 technical alignment, ERC charging-service licensing expectations, MEPSO grid project approval, IEC 62196 Type 2 / CCS2 connector compatibility, OCPP interoperability, and safety / EMC evidence.

Dataset 2026-06-11 Last verified 2026-06-15 5 rows

Compliance Gap Matrix

Gap matrix
Compliance item Common China baseline North Macedonia (ISRSM / ERC / MEPSO) Gap / action Source + verification date
Connector Redesign — IEC 62196 Type 2 and CCS2 China typically uses GB/T 20234.2 for AC connection devices, GB/T 20234.3 for DC interfaces, and GB/T 27930 for DC charger-to-BMS communication. Those materials should not be treated as Type 2 or CCS2 readiness without hardware, cable, pilot signal, locking, PLC/CAN, labeling, and safety re-evaluation.GB/T 20234.2
GB/T 20234.3
GB/T 27930
North Macedonia EV charging deployment follows European IEC interoperability practice for most public and semi-public charging: IEC 62196 Type 2 for AC charging and CCS Combo 2 for DC where the charging model and vehicle fleet specify it. Connector selection is a technical interoperability and procurement requirement, not standalone legal market approval.IEC 62196-2:2025 Type 2 AC connector ecosystem
IEC 62196-3:2022 CCS Combo 2 configuration
Project, fleet, operator, or public-procurement connector requirements
GB/T-only chargers need a hardware and protocol conversion plan for North Macedonia-facing projects: Type 2 or CCS2 couplers, cable thermal rating, lock and proximity circuits, control-pilot behaviour, DC PLC communication where CCS2 is used, charger labels, spare-part list, and retesting after connector redesign.[INFORMATIONAL] Do not describe a GB/T 20234 connector package as Type 2 or CCS2 ready. Connector hardware, communications, labels, and safety evidence should be rebuilt around the specified IEC interface for the intended North Macedonia deployment. International Electrotechnical Commission (IEC)2026-06-15 · reference
ERC Charging-Service Licensing and MEPSO Grid Project Review China GB/T charger test reports and CCC or voluntary certification files address product conformity and do not replace a North Macedonia charging-network operator licence, automation interface process, MEPSO project approval, or local distribution-company energisation procedure.GB/T 18487.1
GB/T 20234 series
China charger certification files where applicable
North Macedonia regulates public charging-service market activity through ERC frameworks, including licensing routes, electronic transactions, charging automation, and market access controls. Grid-side installation and energisation can also involve MEPSO project approval and acceptance processes plus the relevant distribution company.North Macedonia charging and energy transformation regulation
EPDK-like licensing pattern in North Macedonia market practice
MEPSO project approval and acceptance processes
Distribution-company grid connection requirements
Separate product readiness from service-operation readiness. The North Macedonia operator package may need licence-holder details, station registration data, backend integration, site electrical project documents, MEPSO correspondence, metering and tariff data, commissioning records, and local maintenance responsibilities.[INFORMATIONAL] A CE or GB/T product file does not authorise public charging-service operation in North Macedonia. Confirm the ERC licence holder, automation obligations, MEPSO project approval route, and distribution-company energisation steps for each site. Energy Regulatory Commission, North Macedonia2026-06-15 · reference
North Macedonia CE Marking and TS EN IEC 61851 Safety File China commonly uses GB/T 18487.1 for conductive charging system requirements and GB/T 20234 for connection devices. Those files help map technical clauses but do not replace a North Macedonia CE technical file, declaration, North Macedonia-language installation documentation, or TS EN IEC 61851 review where required.GB/T 18487.1
GB/T 20234 series
North Macedonia-market EV charging equipment should be prepared with a CE-style technical file, declaration of conformity, marking, installation manual, and risk assessment for the applicable EU-aligned product legislation. IEC 61851-1:2017 is the core conductive charging system safety standard and covers operating conditions, EVSE-to-vehicle connection, and electrical safety requirements. The local route should be checked with ISRSM catalogue adoption and project or purchaser requirements.CE marking for applicable EU-aligned product legislation
IEC 61851-1:2017
TS EN IEC 61851 series, ISRSM catalogue adoption to be verified
Convert China documentation into a CE-style technical file for North Macedonia: applicable directive mapping, harmonised or adopted standard list, test reports, drawings, critical component certificates, risk analysis, North Macedonia language installation and safety instructions, declaration of conformity, label artwork, and change-control evidence.[INFORMATIONAL] Treat IEC / TS EN IEC 61851 evidence as part of a North Macedonia CE technical-file route, not as standalone market-access approval. Confirm ISRSM adoption and any purchaser or project requirement before claiming market readiness. Standardization Institute of the Republic of North Macedonia (ISRSM)2026-06-15 · reference
OCPP and EMC Back-End Interoperability Chinese DC chargers commonly rely on GB/T 27930 for charger-to-vehicle communication. That protocol is not an operator backend protocol and does not replace OCPP implementation, cybersecurity profiles, backend acceptance testing, remote firmware update procedures, or operator data interfaces.GB/T 27930
Operator backend protocol requirements
OCPP is the open communication protocol between charging stations and charging management systems. OCPP 1.6, OCPP 2.0.1, and OCPP 2.1 are used internationally; OCPP 2.0.1 edition 3 was approved as IEC 63584 in 2024 and OCPP 2.1 in 2025. North Macedonia projects may require OCPP through operator backend, automation, tender, roaming, payment, maintenance, and grid-interaction specifications even when OCPP is not the whole-unit product approval route.OCPP 1.6
OCPP 2.0.1
OCPP 2.1
IEC 63584:2024 for OCPP 2.0.1 edition 3
The North Macedonia project file should identify exact OCPP version, security profile, certificate handling, meter-value mapping, transaction model, remote reset and firmware process, SIM or Ethernet architecture, local operator endpoint, and test evidence from the target charging management system.[INFORMATIONAL] Confirm OCPP version and security profile with the North Macedonia operator before shipment. GB/T 27930 support does not prove backend interoperability with ERC-facing or operator-facing charging management systems. Open Charge Alliance2026-06-15 · reference
EMC, Low-Voltage Safety, and Residual-Current Protection Chinese files may include GB/T 18487.1 safety evidence, GB/T 18487.2 EMC evidence for off-board conductive supply equipment, component certificates, and site electrical drawings. These should be clause-mapped and retested where needed for North Macedonia CE, IEC / EN, site-earthing, RCD, and installation assumptions.GB/T 18487.1
GB/T 18487.2
EV chargers placed on North Macedonia CE-aligned market normally need conformity evidence for applicable electrical safety and EMC legislation. For EVSE, IEC 61851-1 includes EVSE electrical-safety requirements; EMC evidence is mapped separately to the applicable EMC route and charger-specific EMC test standard. Residual-current protection, DC residual-current detection, protective earthing, overcurrent protection, surge protection, and installation coordination should be documented for final site design.Directive 2014/35/EU Low Voltage Directive, North Macedonia implementation to be verified
Directive 2014/30/EU EMC Directive, North Macedonia implementation to be verified
IEC 61851-1 electrical safety requirements
IEC 61851-21-2 EMC route for off-board EV charging systems, current edition to be verified
The gap is often in installation assumptions rather than lab reports: earthing system, upstream breaker, RCD type or RDC-DD arrangement, DC leakage handling, EMC cable routing, surge protection, short-circuit rating, enclosure IP/IK, ambient rating, and North Macedonia-language warnings should match the actual deployment.[INFORMATIONAL] Do not rely on a China EMC or safety report without checking North Macedonia CE scope, IEC / EN test coverage, and the real site protection design. RCD, earthing, leakage detection, and EMC installation assumptions should be documented before commissioning. EUR-Lex / European Union2026-06-15 · reference

Named editorial review

Pending named reviewer

Official regulator, standards body, notified body, customs, or primary legal source preferred. Local PDFs are not accepted.

Editorial controls

Rows must include publisher, official URL, access date, verification flag, and last_verified before human_reviewed can be true.

Official-source register.