# Proof Lab 02: Digital Substation IEC 61850 & Non-DG Data-Center Rack Power | Asaptic
[ASAPTIC](/)

  [EN](/proof-labs/digital-grid-clean-power/)[简](/zh/proof-labs/digital-grid-clean-power/)[繁](/zht/proof-labs/digital-grid-clean-power/)[PT](/pt/proof-labs/digital-grid-clean-power/)[Talk to us](/engage/)

    PROOF LAB 02 · DIGITAL GRID & SOLID-STATE RACK POWER VERIFICATION

# IEC 61850 Substation & Non-DG Rack Power Compliance Lab.

    Verify cross-market technical conformity before a single unit ships. Test **IEC 61850-3 / IEEE 1613** substation protection gateways for **[Run Compliance Benches ↓](#bench-iec61850)[Submit a Grid / Power RFQ →](/engage/)
    Clause-level verification from GB/DL national standards to IEC, IEEE, UL & EN — [inspect live API & MCP tools →](/developers/)

    LIVE VERIFICATION TELEMETRY · LANE 02
    < 4.0 ms · 96.4%
    GOOSE Type 1A Transfer · ORv3 80 PLUS Titanium Peak Efficiency
    **Zero-lithium solid-state power & protection hardware** engineered for immediate air-cargo uplift without Class 9 UN3480 dangerous-goods delays.

      SUBSTATION EMCIEC 61850-3 · IEEE 1613
      RACK POWER SAFETYUL / EN IEC 62368-1
      AIR CARGO STATUS100% Non-DG Verified

    [engage engineering execution → talk to us](/engage/)

  Substation trip determinism **
  Rectifier efficiency **≥ 96.0%** (OCP ORv3 80 PLUS Titanium)
  Air-freight hazard isolation **0.00 Wh** Li-ion (UN3480 excluded)
  Programmatic compliance verification — [asaptic.com/developers/ →](/developers/)

  INTERACTIVE BENCH 01 · DIGITAL SUBSTATION PROTECTION & TELECONTROL

## IEC 61850-3 / IEEE 1613 EMC Surge & GOOSE Select a substation bay architecture, EMC surge zone, and PRP/HSR ring hop count to verify deterministic GOOSE trip transfer times and GB/DL-to-IEC/IEEE clause equivalence.

        Substation Bay Architecture

          Process Bus SV & Protection Bay (IEC 61850-9-2LE / 8-1 Class P2/P3)
          Station Bus Breaker Trip & Interlock (IEC 61850-8-1 Type 1A Class P1)
          SCADA WAN Telecontrol Gateway (IEC 60870-5-104 / DNP3 + IEC 62351)

        EMC Surge & Transient Severity Zone

          Zone A Extreme (±4 kV Surge / ±4 kV EFT · IEEE 1613 Class 2)
          Zone B Standard (±2 kV Surge / ±2 kV EFT · Criterion A)

        HSR / PRP Redundant Ring Hops: 2 hops (HSR Ring)

      COMPUTED GOOSE TRANSFER TIME1.39 ms (IEC-61850-9-2LE / 8-1)
      IEC 61850-5 TRIP GATE (< 4.0 ms)PASS · 1.39 ms < 4.00 ms (Type 1A · Class P2/P3 (
      TIME SYNC & REDUNDANCYIEEE 1588v2 (IEC 61850-9-3) ±45 ns · IEC 62439-3 PRP / HSR Zero-Recovery (0 ms)
      DIELECTRIC & SURGE RATINGIEEE 1613 Class 2 (Error-Free Optical / Shielded) · -40°C to +85°C Fanless IP40 Conformal Coated

          Immunity Test / Phenomenon
          International Standard (IEC / IEEE)
          China Source Standard (GB / DL/T)
          Active Test Level & Criterion
          Hardware Design Verification

        Surge Immunity (Line-to-Earth / Line-to-Line)IEC 61850-3 / IEC 61000-4-5 Level 4DL/T 860.3 / GB/T 17626.5 Level 4±4 kV L-E / ±2 kV L-L (Criterion A — Zero Reset)TVS + Gas Discharge Tube + 3.0 kVrms Galvanic Isolation
Electrical Fast Transient / Burst (EFT/B)IEC 61850-3 / IEC 61000-4-4 Level 4 & IEEE 1613GB/T 17626.4 Level 4 (5 kHz / 100 kHz)±4 kV Power & I/O Ports (Criterion A — Zero Packet Drop)Common-Mode Choke + Shielded RJ45 / LC Fiber Transceivers
Damped Oscillatory Wave (100 kHz & 1 MHz)IEC 61000-4-18 Level 3 / IEEE C37.90.1 SWCGB/T 17626.18 / GB/T 14598.26±2.5 kV CM / ±1.25 kV DM (IEEE 1613 Class 2)Zero GOOSE Frame Corruption under Continuous SWC Injection
Electrostatic Discharge (ESD) & Radiated RFIEC 61000-4-2 (±8 kV Contact / ±15 kV Air) & 4-3 (20 V/m)GB/T 17626.2 Level 4 & GB/T 17626.3±8 kV Contact / ±15 kV Air / 20 V/m (80 MHz–6 GHz)6-Sided Chassis Faraday Seam + Conductive Gasket Grounding

  INTERACTIVE BENCH 02 · DATA-CENTER SOLID-STATE RACK POWER

## OCP ORv3 80 PLUS Titanium PSU & 3-Phase Smart PDU Conformity Solver

  Configure rack power hardware and target destination jurisdiction to generate the cross-market safety, efficiency, and EMC conformity matrix bridging GB 4943.1 / GB/T 9254.1 to UL 62368-1 and CE-LVD.

        Rack Power Hardware SKU

          OCP ORv3 50V DC Shelf Rectifier PSU (3.0 kW – 5.5 kW)
          3-Phase 22 kVA (400V/415V 32A Wye) Smart Monitored Rack PDU
          3-Phase 43.5 kVA (415V 63A Wye) AI Cluster Monitored PDU

        Target Destination Market & Regulatory Regime

          European Union (CE-LVD / EMCD / ErP Lot 9)
          North America (UL / CSA NRTL & FCC / DOE)
          UK, Australia & Singapore (UKCA / RCM / CPSO)

        Operating Load Point (Efficiency & Thermal Check)

          50% Nominal Load (Peak Efficiency Target)
          20% Light Load (Redundant Dual-Bus Mode)
          10% Low Load (80 PLUS Titanium Threshold)
          100% Full Rated Load (Thermal Stress)

      VERIFIED CONVERSION EFFICIENCY96.4% (80 PLUS Titanium min: 96.0%) · PF ≥ 0.99 at 50% load · iTHD < 3.8% (IEEE 519 compliant)
      PRIMARY SAFETY & EMC STANDARDEN IEC 62368-1:2020+A11:2020 & EN 55032 / EN 55035 Class A
      IECEE CB / GB EQUIVALENCE PATHGB 4943.1-2022 + GB/T 9254.1-2021 via IECEE CB Report (EU Group Differences)
      62368-1 ENERGY & FIRE SAFEGUARDES1 Output (50V DC) · PS3 Power Source · Reinforced Insulation · ≥ 20 ms at 100% Load (SEMI F47 Voltage Sag Ride-Through)

#### Mandatory Technical Construction File (TCF) & Factory Audit Deliverables

      - EU Declaration of Conformity (DoC) under LVD 2014/35/EU & EMCD 2014/30/EU

- IECEE CB Test Certificate & Test Report to IEC 62368-1 Ed. 3 with EN Group Differences

- ErP Lot 9 Technical Documentation & RoHS 3 (2015/863/EU) XRF Component Screening

- Input / Output Rating: 200–277 VAC Single-Phase / High-Line HVDC, 47–63 Hz -> 50.5 VDC Regulated Busbar · Hot-Swap Blind-Mate ORv3 Clip

- Ecodesign & Grid Mandate: EU Regulation 2019/424 (ErP Lot 9) — ≥ 94% at 50% load, ≥ 90% at 20% load, PF ≥ 0.95

  INTERACTIVE BENCH 03 · AIR-CARGO LOGISTICS & DG FIREWALL

## Non-DG Air-Freight Screening vs UN3480 Hazard Isolation

  Audit bill-of-materials energy storage components prior to dispatch. Asaptic isolates UN3480 lithium-ion battery trays from solid-state ORv3 PSUs, 3-Phase PDUs, and IEC 61850 gateways so critical rack and grid hardware clears air cargo in 24–48 hours.

        Select Consignment BOM Profile to Screen

          Profile A: Pure Solid-State ORv3 PSU / 3-Phase PDU / Supercap Gateway (0 Wh Li)
          Profile B: Gateway / PDU Controller with Socketed CR2032 Coin Cell (UN3091 vs Scrub)
          Profile C: Integrated Rack with Auxiliary Li-ion BESS / BBU Tray (UN3480 Quarantine)

        PASS · 100% NON-DG AIR-FREIGHT CLEARED

      IATA DGR CLASSIFICATIONNOT RESTRICTED (IATA DGR Special Provision A67 / Non-Hazardous)
      LITHIUM / ENERGY CONTENT0.00 Wh · 0.00 g Lithium Metal · EDLC Supercapacitor (0.47F 5.5V) + FRAM / EEPROM Non-Volatile Memory
      CUSTOMS HS CODE & LANEHS 8504.40 (Static Converters / Server PSU) · HS 8537.10 (Substation Control/PDU)
      AIR UPLIFT CLEARANCE WINDOW24–48 hr Direct Air Cargo Uplift (HKG / PVG / SZX → FRA / LHR / ORD / SIN)

#### Automated Pre-Shipment Screening & Waybill Isolation Protocol

      - BOM Line-by-Line Chemical & Energy Storage Scrub: Zero Li-ion (UN3480/UN3481) and Zero Li-metal (UN3090/UN3091) cells.

- Capacitor Energy Check: All aluminum electrolytic, film, and EDLC supercapacitors verified below 0.3 Wh free-energy threshold (IATA DGR 3.9.2.6).

- Magnetic Field & Wet-Cell Exclusion: Transformer stray flux

  END-TO-END EXECUTION ARCHITECTURE

## How Asaptic Clears Grid & Data-Center Power Deals

  From utility tender parsing to factory type-test verification and split-lane Non-DG air fulfillment.

    01Parse Utility & Hyperscale SpecsExtract clause-level IEC 61850-3, IEEE 1613, OCP ORv3, and UL/EN 62368-1 parameters from public utility tenders and data-center RFQs.
    02Bridge GB/DL to IEC/UL/CEMap Chinese type-test reports (KEMA, CPRI, CQC, CNAS) directly to IECEE CB certificates, NRTL cULus listings, and CE-LVD declarations.
    03Verify Factory Burn-In & EMCAudit 100% Chroma automated ATE load-bank logs, 4 kV surge immunity benches, Hi-Pot dielectric runs, and GOOSE <4 ms hardware timestamp captures.
    04Execute Non-DG Air UpliftEnforce zero-lithium BOM scrubs and strip UN3480 battery modules into separate sea/ground lanes so solid-state power clears air cargo immediately.